Slowframes Artem Shutkin
Vietnam 2026
A curated travel photo story

Vietnam in transit.

Da Nang to Da Lat, March through June 2026. A public field story built from the final site edit, not the whole contact sheet.

02 - Opening sequence

The route in fragments.

Twelve frames as a doorway into the route: mountain air, wet roads, open water and one night fracture. The wider sequence opens lower on the page.

DA NANG HOI AN NHA TRANG DA LAT LAOS CAMBODIA VIETNAM
16N -> 12N
108E -> 109E
04 - Look wider See the route wider. Beyond the opening sequence: Da Nang, Nha Trang, Da Lat and the quieter transitions between them. Look wider: 192 frames The route without the contact sheet

March

Da Nang
14 frames · March

April

Da Nang / Hoi An / Nha Trang
51 frames · April

May

Da Lat
127 frames · May